MWINGI, Kitui County
Heavy rains caused the Mbakini River to burst its banks on Monday, November 16, flooding the Matuu-Mwingi section of the Thika-Mwingi-Garissa Highway and leaving hundreds of travelers stranded for hours.
Vehicles, including buses, matatus, lorries, and private cars, queued on both sides of the crossing as fast-flowing brown floodwaters submerged a temporary makeshift bridge roughly 15 kilometers from Mwingi town. Motorists and passengers waited as the water made the route impassable, disrupting traffic on the vital Nairobi-Garissa (A3) corridor that serves as a key supply and travel link to Garissa and North Eastern Kenya.
Photos and videos from the scene showed long lines of vehicles, including a large coach bus, with crowds of people standing on the eroded banks watching the swollen river. Travelers expressed frustration at being stuck since morning amid continued rainfall.
The disruption highlights a longstanding problem at the site. The previous permanent bridge was washed away years ago and has not been fully replaced. A new bridge has been under construction since around 2022 and is reported by some sources to be about 78 percent complete, leaving only a temporary crossing that is vulnerable to flash floods. Residents say similar cut-offs have occurred repeatedly, including since early last year, and some recalled the 2021 Enziu River bus tragedy in the Mwingi area that killed dozens.
No casualties were immediately reported at the Mbakini crossing, though authorities and local leaders urged motorists not to attempt crossing while waters remain high due to the risk of vehicles being swept away. The flooding is part of wider rain-related disruptions affecting the Nairobi-Garissa highway in recent days, with other sections also impacted, and the Kenya National Highways Authority (KeNHA) having previously closed portions of the road for safety.
Travelers heading toward Garissa, Mwingi, Matuu, or Nairobi were advised to delay journeys where possible, seek alternative routes, and wait for water levels to subside. The incident has renewed calls for faster completion of permanent infrastructure on the route to prevent recurring disruptions to trade, passenger transport, and essential supplies.
